
La Nina 2027-28? What Does U.S. Climate Look Like?
11/17/2026, 5:57 am EST
Climate Impact Company Daily Feature
Issued: Thursday November 19, 2026
Highlight: Latest NOAA/CPC long-lead winter outlooks.
Discussion: The NOAA/CPC month ahead temperature and precipitation probability outlook valid for December 2026 emphasizes mild climate risk for the Northern U.S. and a roaring storm track across the Southern States most hostile in Florida and the northeast Gulf Coast to the Carolinas (Fig. 1-2). The meteorological winter outlook enhances these same climate anomalies (Fig. 3-4). The U.S. Seasonal Drought Outlook erases drought for most of the southern half of the U.S. while Interior Northwest U.S. drought may strengthen (Fig. 5).

Fig. 1-2: NOAA/CPC temperature and precipitation probability forecasts for the U.S. valid in December 2026.

Fig. 3-4: NOAA/CPC temperature and precipitation probability forecasts for meteorological winter 2026-27.

Fig. 5: NOAA/CPC Seasonal Drought Outlook vald for meteorological winter 2026-27.
